
Delivery & support
From our floorto yours.
Who does what between the deposit and a running machine, and what happens after it runs.
Process
Three hand-offs,
one line.
The order runs as one line from our floor to yours. It bends wherever the owner changes, so you always know who is holding it.
JUGAO
Built in Nantong
Set by Incoterm
On the water
Build time · working days from the deposit
80–160 t standard
200 t+, all-electric, tandem
Typical ranges. Your committed date is the one on the production schedule confirmation. The hatched extension applies with a DELEM DA-69T, a raised open height or custom tooling. From 200 t up you get a bilingual shop-floor briefing with the serial number every 7 working days.
If the date moves
- Trigger
- A supply or process issue expected to delay delivery 3+ days.
- Notice
- At least 7 working days before the milestone.
- In writing
- A lead-time letter and recovery plan from the delivery manager.
- Major delay
- Taken to the general manager: compensation or an alternative.
Site readiness
Ready the floor
before it ships.
Power, foundation, door and lifting, per model. Power, civil work and lifting are yours; we supply the drawings and guidance, and both sides sign the site survey form.
≥250 mm
- Power
- AC 480 V, 3-phase, 60 Hz (220 V optional)
- Main motor
- 7.5–11 kW, ≈18 A at 480 V
- Weight
- ≈7.5 t
- Concrete
- ≥250 mm thick, ≥3,000 psi
- Lifting
- Crane rated ≥1.5× machine weight (≥12 t), or an 8–10 t long-fork forklift
≥300 mm
- Power
- AC 480 V, 3-phase, 60 Hz
- Main motor
- 15 kW, ≈24 A at 480 V
- Weight
- ≈11.5 t
- Concrete
- ≥300 mm thick, ≥3,500 psi
- Route in
- Local bearing ≥5 MPa along the path the machine travels
- Lifting
- Crane rated ≥1.5× machine weight
≥350 mm
- Power
- AC 480 V, 3-phase, 60 Hz
- Main motor
- 18.5–22 kW, ≈32 A at 480 V
- Weight
- ≈14.0 t
- Concrete
- ≥350 mm thick, ≥4,000 psi
- Level
- ≤2 mm per 2000 mm
- Lifting
- Crane rated ≥1.5× machine weight
500–800 mm
- Size
- 300–600 t, 4000–6000 mm
- Weight
- ≈22–48 t; cylinders, table and side frames ship split on flat-rack containers and are joined on site
- Foundation
- Own reinforced deep foundation ≥500–800 mm, ≥C35 / 4,500 psi, double-layer two-way rebar, isolated from floor joints
- Lifting
- Two 25–50 t overhead or truck cranes lifting together, at the frame-top lifting lugs only; never by the piston rods or the scale beam
Per drawing
- Size
- 2 × 200 t to 2 × 400 t, 8000–12000 mm overall
- Weight
- ≈30–75 t; two separate bases and one sync control cabinet
- Foundation
- Both machines on one continuous reinforced slab, level ≤1.5 mm over the full length, so settling cannot pull them out of sync
- Drawings
- Our model-specific foundation and lifting drawings, checked and signed by your structural engineer against the soil report before work starts
DoorClear opening ≥3.8 m high and ≥3.5 m wide for 100–200 t.
YoursPower, civil work and lifting, on site and at your cost.
OursInstallation drawings and guidance; the site survey form is signed by both.
Shipping
Every box
on paper.
Six documents on fixed dates, and a sealed-container report within 24 hours of loading. Each record carries the container and seal numbers. No compliance claim goes beyond what has been checked.
Proforma invoice & contractModel, configuration version, Incoterm, payment.
Before signing and the deposit
JUGAO sales, finance
Commercial invoice & packing listHS code (e.g. 8462.29), value, weights, case numbers; matched to the export declaration.
Within 2 working days of loading
JUGAO logistics, finance
Bill of lading or telex releaseConsignee is you or your broker on FOB or CIF.
3–5 working days after sailing; released once the balance is paid
Our forwarder
ISF (10+2) dataRequired by US customs; late filing draws CBP penalties.
At least 48 h before sailing
Data from us, filed by your broker; our agent on DDP
IPPC mark or fumigationOn solid-wood pallets and crates; plywood cases are exempt.
With the loading papers
JUGAO logistics
Certificate of origin & test certificateNo zero-duty claim is made.
With the originals, after the balance
JUGAO logistics, quality
- Double cross lashing, wire-rope tensioners and timber wedges
- Anti-rust oil, VCI film and a sealed foil bag with desiccant
- Tools, foot switch and accessories in numbered plywood cases
- Container and seal numbers on every record
Loading report · within 24 h
- Empty container check
- Machine in, base lashing close-ups
- Packing list matched to case numbers
- Doors shut, seal close-up
- Telex release or release letter, once the balance is paid
Installation
Who lifts,
who powers up.
Unloading and placing are yours. Levelling, wiring checks and power-up are guided by us: remote video guidance is free, an engineer on site is an option.
You
Unload the container
Your forklift, truck crane and rigging crew. Finish inside the container free time; demurrage after that is yours.
You
Lift and place
Lift to our centre-of-gravity lifting drawing. Site lifting safety and third-party insurance sit with you and your rigging crew.
JUGAO
Level, wire, power up
Remote video guidance, free of charge. An engineer in the US is optional: return flights, lodging and day rates as set in the contract.
Ready for power-up?
Tick what is done on your site.
Book the power-up
If our engineer waits on a site that is not ready, the idle time is billed to you.
Training
Three ways
to learn it.
Live online training is the standard. Training at our factory is free; an engineer training your crew in the US is an option.
At our factory
2–3 working days
- Who
- Operators, process staff, maintenance
- Covers
- Controller programming, tool set-up, bend calculation, safety laser alignment; hydraulic and servo checks, common alarms
- Language
- Chinese or English with a technical interpreter; English manual and chaptered HD videos
- Cost
- Free; your team's travel is yours
Live online · standard
2 × 2 h live sessions
- Who
- Your operators
- Covers
- Start-up, parameter setting, first-part bending, live questions
- Language
- English over Zoom, Teams or WhatsApp video, with English documents
- Cost
- Included after power-up, usable for 12 months
At your plant · option
3–5 working days
- Who
- Your whole crew, on your own parts
- Covers
- Programming on parts in production, multi-bend optimisation, a hands-on test for every operator
- Language
- English, directly or with an interpreter; signed attendance and acceptance form
- Cost
- Travel, lodging and day rates as set in the contract; includes installation time
Warranty
Two clocks,
first to stop.
14 months from the bill of lading date or 12 months from acceptance at your plant, whichever ends first. Slide to the month your machine is accepted.
B/L date
Accepted
When something stops
Ticket. Email, WhatsApp or the remote diagnosis module. An engineer replies within 4 h on working days, 12 h otherwise.
Parts. Once a hardware fault is confirmed, the replacement ships by DHL or FedEx.
Covered
Defects in manufacture or in the parts themselves, including main cylinders, frame, servo motors, controller and hydraulic valve blocks. New parts free of charge, with remote support. The failed part is returned, or photographed destroyed, as we instruct.
Not covered
- Wear parts: upper and lower tools, urethane film, seals, filters, fuses, indicator lamps, hydraulic oil
- Burn-out from the wrong oil grade, a lost phase or unstable voltage
- Pressing past rated tonnage, removed safety devices, or system parameters changed without approval
Spare parts
Shipped from
Nantong.
Wear and electrical parts are stocked at our factory; core parts are ordered in. No US warehouse at present. Times below are references, not guarantees, and depend on customs.
In stock
Wear & electrical
Central parts store, Nantong factory
Hydraulic seal kits, high- and low-pressure filters, foot switches, emergency stops, proximity switches, standard relays, standard 835 mm segmented tools.
- Out
- 24–48 h after the ticket is confirmed
- Transit
- DHL or FedEx, 4–7 working days door to door
Ordered in
Core & custom
From the original maker, or built to order
DELEM controller main boards, precision linear scales, model-specific proportional servo valves, custom non-standard long tools.
- Restock
- 7–15 working days, inspected on arrival
- Then
- International air freight to you
Engineering review
Send a drawing.
Get an engineer.
Standard selections answered within 4 hours. Parts outside the rules get a written process review within 24 hours.
- Part drawing: DXF, DWG, STEP or PDF
- Material and thickness
- Longest bend or cut length
- Yearly volume
Write to info@ntjugao.com or message the factory on WhatsApp +86 132 2211 1178.
Drawings (DXF, DWG, STEP, PDF): attach them to an email to info@ntjugao.com, quoting your name.