JUGAO engineers reviewing a drawing on the shop floor

Buying guide · North America

Price, scopeand terms.

How a quotation for North America is priced, what it includes and leaves out, and how your order is locked before we cut steel.

Quote basis

One machine,
one price basis.

Every North America quotation is built line by line on the same baseline machine and the same terms, so two offers can be laid side by side. This site shows the basis only; no fixed price is published.

Quotation · North AmericaCurrency: USD

Machine

Baseline configuration. 125 t × 3200 mm electro-hydraulic synchronised CNC press brake, DELEM controller, AC 480 V / 60 Hz, OSHA safety laser guard, one standard segmented tool set.

Price term

FOB Shanghai or Nantong. Export packing, inland trucking and China export clearance sit inside the machine line.

In the line

Ocean

CIF to a US port. Freight and insurance are costed separately and shown as their own line, so they can be recalculated.

Own line

Duty

DDP to a US port or your door. Clearance and duties are costed separately and shown as their own line.

Own line

30calendar days

A formal quotation is valid for 30 calendar days. It is re-confirmed if the exchange rate moves more than ±2% or raw material prices change sharply. After day 30 it lapses and is reissued under a new version number.

Payment

Deposit
Starts the order and freezes the configuration.
Balance
After the factory acceptance test passes, before shipping.

Scope of supply

Inside the price,
and outside it.

Four parts of every offer. Above the line ships in the price. Below it is quoted separately or arranged by you, so nothing turns up as a surprise at installation.

Tooling

  • Full-length segmented straight punch set, 88°
  • Standard double-V or multi-V die
  • Manual quick clamping
  • Gooseneck punches
  • Acute-angle and large-radius tools
  • Urethane anti-marking film
  • Hydraulic or pneumatic clamping

Safety

  • Emergency stops
  • Foot switch with emergency stop
  • Hydraulic and servo overload protection
  • Guard-door interlock
  • North America build: DSP or Lazersafe laser guard
  • Third-party fencing
  • Extended light-curtain zones
  • Custom two-operator, two-hand stations

Install & training

  • Full factory acceptance test
  • Remote video support
  • Operation and maintenance training at our factory, meals and lodging included
  • Unloading and lifting in the US
  • Site civil work and wiring
  • Engineer travel and day rates in the US, if you want one on site

Documents & spares

  • English manual
  • Electrical and hydraulic diagrams
  • Wear seals and a basic tool kit
  • Acceptance test report and certificate
  • Translations into other languages
  • Third-party notarization
  • Annual spares package

Landed cost

Where our cost
stops.

The same machine on three terms. The orange bar is what our quotation covers; everything after it is on your side.

CIFInsured at 110% of the CIF invoice value.

DDPWe clear as your agent and pay the routine fees; you supply your EIN as importer of record. Duty is a lump sum at the contract-day rate; a sudden extra tariff before clearance is reimbursed at cost.

Every termUnloading at your plant is yours. A landed-cost example always states its date, destination port, volume and weight, and is for reference only. Final freight is locked 7 days before shipping.

Order control

Frozen in a day,
changed by ECN.

Once the deposit arrives the build is signed and frozen. A short, priced change window follows; after that the machine is built as signed. Drag the marker along the bar to see where a change stands.

Day 3 after the freezeA change goes through an ECN: engineering assesses it, finance prices the difference, production re-plans. Both sides sign, you pay the difference, and the BOM moves to V1.1-F.

Annex signed

On the day the deposit arrives, sales, engineering and you sign the contract technical annex.

Frozen

  • Tonnage
  • Controller
  • Axes
  • Voltage · Hz
  • Tooling
  • Safety

Locked to BOM V1.0-F; the production order is issued.

Change by ECN

Within 7 calendar days of the freeze, and only before core parts are bought or steel is cut. Signed by both sides; the BOM moves to V1.1-F.

Built as signed

Once machining starts, or imported core parts such as the DELEM controller and servo valves are bought, no changes in principle. A forced change means you carry the dead stock and the full delay.

Keep comparing

Line it up against
your other offers.

Take the same baseline into the model page, check how a machine is released, and read what happens after shipping.

Engineering review

Send a drawing.
Get an engineer.

Standard selections answered within 4 hours. Parts outside the rules get a written process review within 24 hours.

  • Part drawing: DXF, DWG, STEP or PDF
  • Material and thickness
  • Longest bend or cut length
  • Yearly volume

Write to info@ntjugao.com or message the factory on WhatsApp +86 132 2211 1178.

Drawings (DXF, DWG, STEP, PDF): attach them to an email to info@ntjugao.com, quoting your name.

Contact Us